12-13-2018, 05:54 PM
|
|
|
|
Join Date: May 2007
Location: Central Alberta
Posts: 21,399
|
|
Quote:
Originally Posted by Junglefisher
50x40x12 in 2 days by yourself? You are in the wrong business.
|
They tell me Ken is a Big Boy.
Grizz
__________________
"Indeed, no human being has yet lived under conditions which, considering the prevailing climates of the past, can be regarded as normal."
John E. Pfeiffer The Emergence of Man
written in 1969
|
12-13-2018, 06:39 PM
|
|
|
|
Join Date: Dec 2008
Location: Alberta
Posts: 24,071
|
|
Quote:
Originally Posted by Junglefisher
50x40x12 in 2 days by yourself? You are in the wrong business.
|
I had the floor poured already so I built them on perfect level, and a forklift to stand the walls up (nice little cheat)
I did have help, couple friends here and there when needed. It really was not rocket science, and 4 walls aren't that hard to frame in a day, 2 big doors meant a lot of nothing to do, 40' walls were 2 piece and 50's were 3 iirc.
__________________
Only dead fish go with the flow. The rest use their brains in life.
Originally Posted by Twisted Canuck
I wasn't thinking far enough ahead for an outcome, I was ranting. By definition, a rant doesn't imply much forethought.....
|
12-13-2018, 07:28 PM
|
|
|
Join Date: Jan 2014
Location: Muskoka
Posts: 180
|
|
I am a contractor 35yrs. I quote jobs . If there is a cost over-run ,I eat it, take it as a lesson and make sure I quote better next time. Any extras such as the crane should be discussed prior to the expense, otherwise that would also be on the contractor.
|
12-14-2018, 06:25 PM
|
|
|
|
Join Date: Apr 2013
Location: Edson
Posts: 676
|
|
Quote:
Originally Posted by Ken07AOVette
I had the floor poured already so I built them on perfect level, and a forklift to stand the walls up (nice little cheat)
I did have help, couple friends here and there when needed. It really was not rocket science, and 4 walls aren't that hard to frame in a day, 2 big doors meant a lot of nothing to do, 40' walls were 2 piece and 50's were 3 iirc.
|
Yeah, framing 4 walls that size in a day is doable. But I would allow a half day for one guy to cut 160 odd studs, cut the headers and trimmers and nail them all together. Leaving less than half a day for trusses, ladders, fascia,sheeting, porkchops, garage door liners, installing man doors, overhead doors..... That's a real solid two days work IMO.
__________________
Cheers,
Craig
|
12-14-2018, 06:51 PM
|
|
|
|
Join Date: Dec 2008
Location: Alberta
Posts: 24,071
|
|
The doors and windows weren't installed in those 2 days, trusses either. Just walls like I said.
__________________
Only dead fish go with the flow. The rest use their brains in life.
Originally Posted by Twisted Canuck
I wasn't thinking far enough ahead for an outcome, I was ranting. By definition, a rant doesn't imply much forethought.....
|
12-15-2018, 01:38 AM
|
|
|
Join Date: Mar 2016
Posts: 584
|
|
Quote:
Originally Posted by Grizzly Adams
And a picker shouldn't be required.
Grizz
|
Agreed
|
12-15-2018, 06:14 AM
|
|
|
Join Date: Sep 2009
Posts: 2,187
|
|
Split the difference, and tell him you will not be giving a positive recommendation, as he has shown he doesn't deserve it. (not just the money....the delay, the tyvec, the garbage, the mis-estimating).
If you recommended him to me, and I experienced these things, I'd think less of you, and I'd have real issues with him.
If he wanted this job to "build his business", I'd say he messed that up.
__________________
"It'd be nice if...."
|
12-15-2018, 09:02 AM
|
|
|
|
Join Date: Dec 2008
Location: Near Edmonton
Posts: 15,049
|
|
Lots of different perspectives, would love to hear how this ends up working out. Please post once you have it settled with him.
|
12-16-2018, 09:33 AM
|
|
|
Join Date: Nov 2012
Location: Calgary
Posts: 89
|
|
So we got everything settled yesterday. I printed off 2 copies of a construction contract outlining what I was going to pay him and at what stages of construction. He agreed without issue and we signed the written contracts. I ended up paying $2000 for labour and no picker truck. This whole scenario could have been a real nightmare but ended up going well in the end, thank you to everyone on here for their input and opinions.
|