Default Proper depth for deck footing in Southern Alberta?

4' for concrete pillars? Thanks.
__________________
“I love it when clients bring Berger bullets. It means I get to kill the bear.”

-Billy Molls
Reply With Quote
  #2  
Old 09-17-2015, 12:41 PM
fish_e_o fish_e_o is offline
Banned
 
Join Date: Jan 2010
Location: rollyview
Posts: 7,860
Default

depends on soil and geography

my uncle was told to go 40' on the edge of a ravine. he appealed it i'm not sure what's happening now
Reply With Quote
  #3  
Old 09-17-2015, 01:13 PM
Sneeze Sneeze is offline
 
Join Date: Aug 2009
Posts: 3,197
Default

Depends what the municipality wants.

Typically, unless the deck is under 3' high, you will need 4' piles on pad footings.

http://www.lethbridge.ca/Doing-Busin...20Template.pdf
Reply With Quote
  #4  
Old 09-17-2015, 01:15 PM
Buckhead Buckhead is offline
 
Join Date: Sep 2007
Location: Strathcona County
Posts: 1,939
Default

A very general guideline if your deck can tolerate some vertical movement due to frost heaving would be below the frost depth which is about 1.5 m in you area so about 6 feet.
If the structure cannot tolerate any vertical movement then you would need to go about double that - 10 to 12 feet with a piling system.
Reply With Quote
  #5  
Old 09-17-2015, 01:38 PM
Buckhead Buckhead is offline
 
Join Date: Sep 2007
Location: Strathcona County
Posts: 1,939
Default

Quote:
Originally Posted by fish_e_o View Post
depends on soil and geography

my uncle was told to go 40' on the edge of a ravine. he appealed it i'm not sure what's happening now
There may be a valid reason for that. Improper excavation or construction of foundations at the crest of or one the slope could result in slope failure (slide), meaning you wake up one day and your house is at the bottom of the ravine.
I would not construct on that situation without having a slope stability analysis and construction recommendations signed and stamped by a professional geotechnical engineer.
Reply With Quote
  #6  
Old 09-17-2015, 01:39 PM
JonBoy JonBoy is offline
 
Join Date: Oct 2014
Posts: 452
Default

I went with engineered screw piles to 10 ft. I figured, did I really want to deal with a deck that moves around after a few years? At 10 ft, it should be rock solid for a LONG time.

I wouldn't do anything less than 4' and 6-8' would be even better.
Reply With Quote
  #7  
Old 09-17-2015, 01:44 PM
fish_e_o fish_e_o is offline
Banned
 
Join Date: Jan 2010
Location: rollyview
Posts: 7,860
Default

Quote:
Originally Posted by Buckhead View Post
There may be a valid reason for that. Improper excavation or construction of foundations at the crest of or one the slope could result in slope failure (slide), meaning you wake up one day and your house is at the bottom of the ravine.
I would not construct on that situation without having a slope stability analysis and construction recommendations signed and stamped by a professional geotechnical engineer.
i get it and the foundation pilings are all up to snuff. but the deck piling? if there's a land slide and it leaves your deck or takes your deck and the land around your house i'm sure the difference is rather unsubstantial. but hey i'm cheap and i'm sure it runs in the family
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -6. The time now is 09:45 AM.


Powered by vBulletin® Version 3.8.5
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.