Quote:
Originally Posted by Lefty-Canuck
Turn around right now for any type of steingsbwould likely be 14-20 days, hopefully you don’t need them on a rush basis! I use 60X But if I did use a local builder I would use Corey at Edgecutter.
LC
|
Nope, not in a huge rush. I have heard good things about 60X might have to explore that route. Thanks so much for the input everyone!!