Quote:
Originally Posted by walking buffalo
What finish did they use?
How soon after finishing was the floor covering and tape applied?
Why was the tape left on for two weeks?
Did the experts say this would be ok?
Depending on the type of finished applied, buffing out and recoating could be done, or not. It really depends on details not provided yet.
|
To clarify. They renovated a bathroom. Covered and taped the floor during the job to protect the floor. Their is no question they will make it right. I just think intuitively putting a buff and top coat on a old floor will look bad or fall apart quicker. I am thinking to do it properly it needs to be stripped, sanded, restained and recoated. But I am not an expert on hardwood floor refinishing.
3M guy said not to leave the tape on more than 5 days however they acknowledged it doesn’t say that anywhere on the product. They will fix that. Contractor never had that happen before.
I think everyone is being upfront. Just want the hardwood fixed. Any ideas?