The thing I can't stand is dealing with the reps from the companies that produce the fittings. Anything to get around having to back charge or replace their products. All about cost as I outlined earlier. Even on shutdowns in our local coal fired power plants, tubes that should have been chopped due to wall loss have shielding welded on and left for the next 6 months before it eventually leaks.
|