Quote:
Originally Posted by Ricochet Ranch
No it's not lol I work in QC. The last 3 projects I have been on contained fittings or valves that came cracked from the manufacturer and it was treated like it was normal. I caught the cracks in all 3 instances and at the end of the day it came down to budget and leaving the fittings in service after a bit of surface grinding.
Sorry if you didn't get my sarcasm in my first post but at the end of the day the bean counters decide how much quality is needed.
|
You are QC for the whole industry? Or a specific sector? Because in my field it is high. Zero defect allowance. Maybe the standards are lower in your feild.