View Single Post
  #19  
Old 03-09-2014, 01:15 AM
TreeGuy's Avatar
TreeGuy TreeGuy is offline
 
Join Date: May 2007
Location: Calgary
Posts: 11,576
Default

Quote:
Originally Posted by bhguy View Post
we have a huge and almost free target out at the lake. 48"x48"

1) cut cardboard 44" long and do a lot you will need it.

2) cut 2 2x6 4" long

3) drill a hole at either end of the 2x6 1.5 " in

4) cut 2 piece of 5/8 ready rod 50" long

5) stack it all and tighten the nuts down.

one big target, almost free, when the center is gone, tighten up the nuts/ replace the cardboard.

labour about 45 mins

Haha! Same here. Heavy buggers though.
Reply With Quote