Quote:
Originally Posted by bhguy
we have a huge and almost free target out at the lake. 48"x48"
1) cut cardboard 44" long and do a lot you will need it.
2) cut 2 2x6 4" long
3) drill a hole at either end of the 2x6 1.5 " in
4) cut 2 piece of 5/8 ready rod 50" long
5) stack it all and tighten the nuts down.
one big target, almost free, when the center is gone, tighten up the nuts/ replace the cardboard.
labour about 45 mins
|
Haha! Same here. Heavy buggers though.